I\'m currently using Team Foundation Server 2008 as a source control and build engine. When I checkin some changes and associate the change with a work item the work item flow I\'ve defined changed th
How do I change the default state for a Work Item? I tried 开发者_StackOverflowchanging the transition with no source, but it still says \"Active\" as the default. I tried renaming the Active state to
We\'re using TFSwith MSF for Agile 4.2 on a project, and I have a bunch of work to do, both Tasks and Bugs. Both are prioritized by our managers, and assigned due dates and target releases.
Is it poss开发者_开发技巧ible to change the type of a TFS work item? For example, I have a Bug I would like to change to a Change Request.As noted you cannot directly change the work item type however
We are using Tasks to track individual development items and the \"out of the box\" configuration gives us only 2 states - Active and Closed.We would like to change it to:
Team Foundation Server 2008 allows that every check-in is associated with a work item, but what do you do if you are developing s开发者_StackOverflow社区ome features which span several Team Projects?
How can you change the icon that represents a work item type in TFS Web Access?For instance, a bug appea开发者_开发问答rs as a page with a red squiggly line, while a task is a page with a red check ma
Is there a way in TFS in VS2010 to specify that a particular iteration is the current one, and then return that for use in queries similar to the开发者_开发百科 way @Project works?If not is there a wa
I am new to TFS and am told that TFS (VS 2008) has an internal bug tracking system. I have used open source bug tracking systems before but want to work with TFS now.