I\'m starting to work with workflow foundation and I\'m doing several tests to understand how it works.
I have 7 workflow that need to execute; that need to run in certain order ? Is there any schedu开发者_StackOverflow中文版ling service for this in wf4 or any other approach i can use?
Closed. This question does not meet Stack Overflow guidelines. It is not currently accepti开发者_如何转开发ng answers.
My workflow: <Activity mc:Ignorable=\"sap\" x:Class=\"QCISRApplication.QCISRTest1\" xmlns=\"http://schemas.microsoft.com/netfx/2009/xaml/activities\" xmlns:av=\"http://schemas.microsoft.com/winfx/
I have workflow designer which I use for authoring workflow; now when I drop any activity to Designer I catch that in ModelChanged event and can get the all the InArguemnt of that type now I want to a
I have an activity that consists of an Receive activity and a SendReply activity. The receive activity waits for a message then it writes it out to the console and then sends a reply.
I need to write a static method which is performing some kind of parsing on a string with signature like:
Is there a way to exit a workflow more gracefully than throwing an InvalidWorkflowException? I\'m writing an activity (that interacts with an SQL database) that needs to short-circuit if an opera开发者
When I rehost a designer, I can declar开发者_如何学Pythone variables and their scopes. However, not all activities can be the scope of a variable. I notice Sequence, Parallel, PickBranch can be the ho
We have a business logic for managing the document life cycle. This is implemented using Workflow Foundation 4 and WF Persistence.