I want to create a a main process in BPM开发者_C百科N(High level BPMN) that has several sub process and I want to hide them from the modeler,that is I will provide only the main process for the modele
Closed. This question is off-topic. It is not currently accepting answers. Want to improve this question? Update the question so it's on-topic for Stack Overflow.
Can anybody pl开发者_JAVA百科ease tell me what Visio Process Simulator is?How can I use it with Rockwell Arena simulation software?First off, I just want to disclose that I am the developer of a tool
I am currently sorting out some screenshots for some software documentation.I take a screenshot, paste it into visio 2007, do some alterations and add shapes etc and开发者_如何学JAVA then copy it into
I have a VBA macro that draws dynamic Connectors. The connector master is instiantated like this: dim flowChartStencils as visio.document
I开发者_如何学C want to create an add-in to visio so that I can draw BPMN diagrams (Business Process Modeling Notation). A similar work is available here: http://www.interfacing.com/free-visio-bpmn-mo
I\'ve hit a minor brick wall here in Visio. I\'ve got a project that I\'m running that\'s hosted under sqlserver and is subject to lots of model changes in Visio 2007 (via a 3rd party).
I know Visual Studio 2010 Ultimate has some abilities, and I would normally do this by instinct, but I am on a very tight schedule.I also have Visio 2010 installed and integrated into VS, but its reve
Today I got a diagram similar to this one. The diagram I got was produced using Visio which I don\'t have. I haven\'t seen such a diagram before and its symbols are not clear to me.
I currently have a license to visual studio 2010 pro.I always liked visio, but the price has been pretty high to inv开发者_JAVA技巧est.I know that it can work with VS to auto generate classes and also