I need to wait on a tas开发者_JAVA技巧k that I created in the production code from the test code. Is it possible to do that? I am using Nunit framework for testing.You should be able to Task.Wait from
How do I run NUnit tests developed within VS2010 on a Mac? This seems like a very simple and naive question but I have been struggl开发者_Python百科ing to find all the steps. I have done my due dilige
I have a VS project and in the project properties under the Debug tab I set: Start External Program:D:\\SolutionName\\packages\\NUnit.2.5.10.11092\\tools\\nunit.exe
I\'m using VS2010 to develop a project and will be adding some NUnit tests to an existing test harness which is full of MStests.How do i run only the NUnit tests from that harness in Mono? Is there wa
Is it possible to either copy and existing database, or generate t开发者_运维技巧he sqland then run it against a sql database to create a copy of an existing database?
I would like to get a list some reference or sample application projects in .NET/C#- with good test coverage.
I am trying to learn Moq but it is proving somewhat difficult. If I want to implement some basic tests using nUnit and Moq for the account controller in a new MVC3 project, how would I go about it?
Is there something similar to Sequential Attribute that I can put on the class itself. And use theSequential variables on the class level and not on a specific test level as it works with Se开发者_Sta
I am approaching database testing with NUnit. As its time consuming so I don\'t want to run everytime.
I have an application which needs to reference a set of reference codes (a 3-char code and it\'s associated short description). The data doesn\'t change -- or at least I\'ve never known it to change i