I\'m trying to construct an algorithm that validates that a double value is a member of a range defined with min, max and step values. The problem is checking that the value obeys the step rule. For i
How would I write the XSD to validate the StartDate element and EndDate element are within the Quarter element and Year element?Thanks.
I am writing a program in VBA that first compiles a Range from a series of cells and then later loops through the range to collect the data in the cells.
When Excel saves a file, it attempts to combine identical Validation settings into a single rule with multiple ranges.
and first of all, thank you for taking the time to read my question. I am trying to write a script, and I\'ve come across an issue which I am finding hard to solve. I am working with a pair of number
As far as I know floating point values are of the form n * 2^e, with float range being n = -(2^23-1) - (2^23-1), and e = -126 - 127,
While looking at the followin开发者_如何学Gog answer I wanted to replace the range with a filter.
I have a bunch of data that looks a little like this: <item> <colour>Red</colour> <date_created>2009-10-10 12:01:55</date_created>
I have some strings, entered by users, that may look like this: ++7 7++ 1++7 1+7 1++7+10++15+20+30++ Those are to mean:
I went into phpMyAdmin and changed the value for an integer(15)fi开发者_运维技巧eld to a 10-digit number, so everything should work fine. I entered the value \'4085628851\' and I am receiving the foll