I succeed to include ojdbc14_g.jar to my project, but I am asked to import OracleConnectionPoolDataSource which is included in ojdbc14_g.jar.
i currently try to execute the following query on an Oracle DB select tzname || \' (UTC\'|| tz_offset(tzname) || \')\' from v$timezone_names
I\'ve spent the better part of the day trying to determine why a merge statement won\'t work and I\'m starting to think the problem must be something a bit exotic.
I have a stored procedure that, I am currently working on which uses dynamic sql query. It has one variable assigned to (5000 - 6000 characters of dynamic SQL) and another variable assigned to (5000
I am getting the below error. Don\'t know why this error is popping up. Please suggest: SQL> CREATE OR REPLACE TRIGGER test_trigger
Say I have the following code Some Sql query... is followed by this condition AND EndDate < TO_DATE(\'02/14开发者_JAVA百科/2011\',\'MM/DD/YY\')+1
I need your help with this error: ORA-00907 on Check C开发者_开发问答ONSTRAINT Query: CREATE TABLE S_NEWS.T_UTILISATEUR_USR (
I Installed Oracle forms 10g on windows7 and created a sample form . Then I start up OC4J and run the form.
I need to cast a varchar to a float.(The varchar is guaranteed to be a number) I\'m trying to create a materialized view on top of a pre-built table.Because of this, all the data types must match exa
I got a date like this \'1302104376\' stored with the italian timezone UTC+1. I need to convert it into the format DD:MM:YYYY HH:SS, but with timezione UTC + 0 (GMT). Does exists a function that does