I\'ve got a git workflow question, and I don\'t fully understand all the terms to know what to google for.
The SharePoint install is a SP2010 install on a 2008 R2 server. Everything is fully patched. I am running the SP Designer on the SharePoint Server directly.
A Clojure-based project of mine uses the netty (required by aleph) web server. I start the server, along with other components, in a web.clj file like this:
I would like to implement next workflow scenario: I have workflow service with two branches. Operation2 (Receive activity) is correlated with CorrelationHandle “handle2” which is initialized from m
There are many elements in repo and I start workflows specifying a document attached to the workflow:
My question is about the Flow Decision designer object.Can I change the sides that the \"True\", \"False\", and Inputs come from?Currently, True is always to the left, False on the Right, and input is
So lets say that I have two views, one that is the default and another that can be triggered with a button. Is it possible to switch views, then have the view that you switched to become the default v
I apologize if this is obvious or easy, I have looked at a good number of git/github tutorials and read other articles, but I want to make sure what I\'m doing is right.
When I run git remote -v in one of my Git repositories that has a remote(s) configured, I see that each remote has 开发者_JAVA技巧both fetch and push specs:
I\'m no git expert by any means, so I want to make sure the following flow is good: Find a repo I want to contribute to. (original repo)