We are using TFS build and we have a couple of custom steps within the configuration (e.g. running NUnit tests in AfterCompile target, deployment steps in AfterDropBuild target etc.). Now I wanted to
In our case we want to igonore changes in code comment headers for generated code. In Visual Studio, we can change the merge tool (GUI that pops up) and use a 3rd party tool that is able to be customi
My shop uses TFS & is generally happy with it with the exception of the lack of local repository commits/reverts. I\'m starting to use Mercurial locally myself to help manage smaller chunks of cha
Our TF Server is installed on a Windows 2008 Server (32-bit) and the build service is installed on a 2008 Server 64-bit. When attempting to get the build service going, the agent is reported as being
I\'m trying Agile with Team Foundation Server 2010 for the fist time. I\'d like input for each sprint a start date and an end dat开发者_JAVA百科e but I think that is not possible actually.
I am using a custom workflow for tasks in TFS 2010.However, when I check in code using the Pending Changes window and \"Resolve\" a task it is au开发者_如何学编程tomatically put into a state of Closed
I would like to force the date of the check-in in TFS. Is there any way? I got the following code, but could not find any way to pass a check-in date:
As an ISV company we slowly run into the \"structure your code\"-issue. We mainly develop using Visual Studio 2008 and 2010 RC. Languages c# and vb.net. We have our own Team Foundation Server and of c
HI, We are a small TDD team. We have a LCD screen mounted on the wall which we would like to have display the status of our builds together with current code coverage.
I have installed StyleCop CheckIn policy (from here) and it works great. However I have written some custom rules which I want to be enforced as part of the CheckIn policy (Visual Studio 2008, 开发者_