Problem Description: there is n tasks, and in these tasks, one might be dependent on the others, which means if A is dependent on B, then B must be finished before A gets finished.
This question already has answers here: Multiple simultaneous download开发者_运维问答s using Wget?
I\'ve just been experimenting with MPI, and copied and ran this code, taken from the second code example at [the LLNL MPI tutorial][1].
I\'m working with someone who has some MATLAB code that they want to be sped up. They are currently trying to convert all of this code into CUDA to get it to run on a CPU. I think it would be faster t
I think I have implemented some of my code wrong.I cannot figure out why my sort (using arrays.sort) is taking longer in the \"parallel\" version than in the non-parallel version (it\'s obviously in p
I\'m planning to start \"playing\" with task-based parallelism for a cross-platform project. I wanted to use Intel Threading Building Blocks. I\'m starting with Windows and Visual Studio.
I have a very large data file, and each record in this data file has 4 lines. I have written a very simple C program开发者_如何学Go to analyze files of this type and print out some useful information.
In C# class ParallelTest { public static void Main() { System.Threading.Tasks.Parallel.ForEach(new []{1,2,3,4,5,6,7,8},
I\'m w开发者_Python百科riting an MPI program to be run over a local area network. These machines can be ssh\'d to by any student at any time.
I want to build web service with Visual studio and run it for testing and to try to access it from another computer in the same network,but it won\'t work,