I want to design the SSRS 2008 (not sql server 2008 R2) based reports for Project server 2010. Reports should show , how many projects are going on ? tasks status by dates and all.
Is it possible to make a workflow progress to the next step after an error? Assuming that the error cause was fixed.
For project server 2010, can a project have multiple owners to that one project? Also I havea a project where the owner can not approve the timeshe开发者_运维百科ets(its a server issue) but can anybod
I\'ve just tried out TFS 2010 today, along with Project 2010 and VS 2010. Only Later realized that without Sharepoint, TFS is only configured as Basic. This reduces it\'s functionality as oppose to wh
I am trying to get a tutorial or step by step instructions on how to connect MS Project 2010 to MS Project Server 2010.
Most languages make it easy to take an array like [1, 2, 3] and assign those values 开发者_如何学Cto variables a, b, and c with a single command.