How to compare two Joda time Periods
It does not seem strai开发者_如何学Goghforward.
I am trying this:
@Override
public int compare(Period o1, Period o2) {
return o1.toStandardDays().getDays() > o2.toStandardDays().getDays() ? -1 : (o1.toStandardDays().getDays() == o2.toStandardDays().getDays() ? 0 : 1);
}
But I get this exception:
java.lang.UnsupportedOperationException: Cannot convert to Days as this period contains months and months vary in length at org.joda.time.Period.checkYearsAndMonths(Period.java:1455) at org.joda.time.Period.toStandardDays(Period.java:1314)
I hoped Peroid
would have an isLongerThan(Period p)
method.
From the Joda Documentation:
To compare the actual duration of two periods, convert both to durations using
toDuration
, an operation that emphasises that the result may differ according to the date you choose.
The two toDuration
methods are BasePeriod#toDurationTo(ReadableInstant)
and BasePeriod#toDurationFrom(ReadableInstant)
. This means that you must choose either a start or end instant of this period in order to be able to compute its duration.
If that is a problem for you, then you might want to directly use Duration
instead of Period
.
As Matt Ball also explained in his answer, to compare 2 periods you need to convert them to a duration first. Durations are relative to a certain point in time, so you need to do something like this:
public static boolean isLonger(Period p1, Period p2) {
Instant now = Instant.now();
Duration d1 = p1.toDurationTo(now);
Duration d2 = p2.toDurationTo(now);
return d1.isLongerThan(d2);
}
public static boolean isShorter(Period p1, Period p2) {
Instant now = Instant.now();
Duration d1 = p1.toDurationTo(now);
Duration d2 = p2.toDurationTo(now);
return d1.isShorterThan(d2);
}
I wrote a method that should be able to compare two Periods to the nearest day (I didn't care about hours and minutes):
private int comparePeriods(Period period1, Period period2)
{
if (period1.getYears() != period2.getYears())
{
return Integer.compare(period1.getYears(), period2.getYears());
}
if (period1.getMonths() != period2.getMonths())
{
return Integer.compare(period1.getMonths(), period2.getMonths());
}
if (period1.getWeeks() != period2.getWeeks())
{
return Integer.compare(period1.getWeeks(), period2.getWeeks());
}
if (period1.getDays() != period2.getDays())
{
return Integer.compare(period1.getDays(), period2.getDays());
}
return 0;
}
Note that this method expects both periods to be normalised or it will not give accurate results.