开发者

Which is better? Unit-test project per solution or per project?

Is it better to have a unit-test project per solution or a unit-test p开发者_StackOverflowroject per project?

With per solution, if you have 5 projects in the solution you end-up with 1 unit-test project containing tests for each of the 5 projects.

With per project, if you have 5 projects in the solution you end-up with 5 unit-test projects.

What is the right way?

I think it's not the same question as Write Unit tests into an assembly or in a separate assembly?


Assemblies are a packaging/deployment concern, so we usually split them out because we don't want to deploy them with our product. Whether you split them out per library or per solution there are merits to both.

Ultimately, you want tests to be immediately available to all developers, so that developers know where to find them when needed. You also want an obstacle free environment with minimal overhead to writing new tests so that you aren't arming the cynics who don't want to write tests. Tests must also compile and execute quickly - project structure can play a part in all of this.

You may also want to consider that different levels of testing are possible, such as tests for unit, integration or UI automation. Segregating these types of tests is possible in some tools by using test categories, but sometimes it's easier for execution or reporting if they are separate libraries. 

If you have special packaging considerations such as a modular application where modules should not be aware of one another, your test projects should also reflect this.

In small projects where there aren't a lot of projects, a 1:1 ratio is usually the preferred approach. However, Visual Studio performance quickly degrades as the number of projects increases. Around the 40 project mark compilation becomes an obstacle to compiling and running the tests, so larger projects may benefit from consolidating test projects. 

I tend to prefer a pragmatic approach so that complexity is appropriate to the problem.  Typically, an application will be comprised of several layers where each layer may have multiple projects.  I like to start with a single test library per layer and I mimic the solution structure using folders. Divide when complexity warrants it. If you design your test projects for flexibility then changeover is usually painless.


I would say a separate project for each unit test project rather than in one project per solution. I think this is better because it will save you a lot of hassle if you decide to take a particular project out of a solution and move it to another solution.


We have one to one ratio from file to projects of solution in a very large system, we have reached a point where build takes more than 90 mins every time we check-in. I have created new solution configuration which builds only test projects, new configuration runs once a days to make sure all test cases are working ,developers can switch to unittest config to test their code in their development environment. Pl. let me know your feed back


I am going with one of those "it depends" answers. Personally, I tend to put all of the tests in a single project, with separate folders within the project for each assembly (plus further sub-folders as necessary.) This makes it easy to run the entire set, either from within VisualStudio or CruiseControl.net.

If you have thousands of tests, a single project might prove too difficult to maintain. Also, as Peter Kelly mentioned in his response, being able to easily split the tests if you move a project can be useful.


Personally I write one test assembly per project. I then create one nunit project per solution and reference all of the relevant test assemblies from that. This reflects the organisation of the projects and means that if projects are reused in different solutions then only the relevant unit tests need to be run.

0